1 |
INSTALLATION OF AUTO TRANSFORMER, EARTHING, 275KV AND 33KV CABLE LAYING @ MATANG SUBSTATION |
LARSEN & TOUBRO LIMITED / SEB |
2019 |
COMPLETED |
2 |
TRANSFORMER VACUUMING AND OIL FILTRATION FOR 4 UNTIS OF 320MVA & 220MVA 275/132KV POWER TRANSFORMER @ TANJUNG KIDURONG COMBINE CYCLE POWER PLANT |
SINOHYDRO CORPORATATION (M) SDN BHD / SEB |
2019 |
COMPLETED |
3 |
BUSHING REPLACEMENT AND TESTING FOR MURPHY BORF |
ABB MALAYSIA SDN BHD / MURPHY OIL |
2019 |
COMPLETED |
4 |
KERJA-KERJA MENAIK TARAF DAN MAMBAIK PULIH BANGUNAN SK ST. HENRYSLABI |
LEMBAGA PENGURUSAN SEKOLAH |
2019 |
COMPLETED |
5 |
INSTALLATION OF 450MM AAC MAIN & RESERVE 275KV BUSBAR DAMPANG WIRE |
GE POWER SERVICES (MALAYSIA) SDN BHD / PERTAMA FERROALLOY SDN BHD |
2019 |
COMPLETED |
6 |
275 & 132KV DS FINAL ALLIGNMENT WORK |
LARSEN & TOUBRO LIMITED / SARAWAK ENERGY BERHAD |
2019 |
COMPLETED |
7 |
CONTROL CABLE TERMINATION AT SAMALAJU MPA PLANT 275KV GIS SUBSTATION |
VI SEMPURNA/MPA |
2020 |
COMPLETED |
8 |
KEMANTAN 275KV 240MVA AUTO TRANSFORMER OIL FILTRATION WORKS |
ONE ASIA ENGINEERING SDN BHD / SEB |
2020 |
COMPLETED |
9 |
INSTALLATION OF POWER TRANSFORMER, REACTOR, EARTHING WORK, 33KV CABLE LAYING @ LAWAS SUBSTATION |
LARSEN TOUBRO LIMITED/SEB |
2020 |
COMPLETED |
10 |
SIBIYU EARTHING TRANSFORMER BUSHING REPLACEMENT |
PESTECH SDN BHD/SEB |
2020 |
COMPLETED |
11 |
MULTICORE, AUXILIARY POWER CABLE LAYING & TERMINATION @ SIBIYU SUBSTATION |
PESTECH SDN BHD / SEB |
2020 |
COMPLETED |
12 |
OIL DGA TEST FOR MARUDI JUNCTION TRANSFORMER |
LARSEN & TOUBRO LIMITED/SEB |
2020 |
COMPLETED |
13 |
275/132KV AIS SUBSTATION MAINTENANCE @ TONDONG SUBSTATION |
SIEMENS ENERGY/SEB |
2020 |
COMPLETED |
14 |
ELECTRICAL ERECTION AND INSTALLATION WORKS FOR 132KV SUBSTATION @ SIBIYU SUBSTATION |
PESTECH SDN BHD / SEB |
2020 |
COMPLETED |
15 |
OIL FILTRATION FOR 1 UNIT 22MVA 20/6.6KV TBEA TRANSFORMER |
SINOHYDRO CORPORATATION (M) SDN BHD |
2020 |
COMPLETED |
16 |
VACUUMING & OIL FILTRATION OF 2 UNIT 240MVA AUTO TRANSFORMER @ KEMENA 275KV SUBSTATION |
TRANSYSTEM CONTINENTAL SDN BHD / SEB |
2020 |
COMPLETED |
17 |
OIL FILTRATION FOR TRANSFORMER & REACTOR |
SIEMENS ENERGY / SEB |
2020 |
COMPLETED |
18 |
AUX CABLE LAYING & TERMINATION WORK AT TIGER GAS PLANT |
VI SEMPURNA SDN BHD |
2021 |
COMPLETED |
19 |
INSTALLATION OF 10MVA STEP UP TRANSFORMER AT LIMBANG POWER STATION |
UPS PROTECTION SDN BHD |
2021 |
COMPLETED |
20 |
OIL FILTRATION FOR 1 UNIT 20/6.6KV TRANSFORMER SST |
SINOHYDRO CORPORATATION SDN BHD |
2021 |
COMPLETED |
21 |
ERECTION OF 132KV GIS @ SIBIYU SUBSTATION |
PESTECH SDN BHD / SEB |
2021 |
COMPLETED |
22 |
RELOCATION OF EARTHMAST AT TONDONG 275/132/33KV SUBSTATION SARAWAK |
ABB HITACHI ENERGY / SEB |
2021 |
COMPLETED |
23 |
TRANSFORMER INSTALLATION SUPERVISION OF 240MVA TRANSFORMER AND 132MVA TRANSFORMER @ MATANG & LAWAS SUBSTATION |
ABB POWER GRIDS (THAILAND) LIMITED / SEB |
2021 |
COMPLETED |
24 |
DISMANTLE AND REINSTALL OF 132KV CABLE SEALING END CONNECTOR @ MUARA TABUAN SUBSTATION |
ZAFAS SDN BHD / SEB |
2021 |
COMPLETED |
25 |
COMMISSIONING OF SPECIALIST ELECTRICAL, HVAC & INSTRUMENTATION SYSTEM (REMOVE AND REINSTALL SCLR) |
PENGERANG POWER SDN BHD / PETRONAS |
2021 |
COMPLETED |
26 |
45MVA TRANSFORMER OLTC SERVICING & TESTING WORK AT SAKURA BINTULU, SARAWAK |
ABB MALAYSIA SDN BHD/ SAKURA FERROALLOYS SDN BHD |
2021 |
COMPLETED |
27 |
TONDONG 275KV REMOTE END RETROFITTING WORKS, TESTING, COMMISSIONING AND ASSOCIATED WORKS @ TONDONG, MAMBONG, MATANG, ENGKILILI SUBSTATION |
BAKUN SEJATI SDN BHD / SEB |
2021 |
COMPLETED |
28 |
INSTALLATION OF TRANSFORMER CT AND HV BUSHING TEST @ LAWAS SUBSTATION |
TBEA SHENYANG TRANSFORMER GROUP CO. LTD / SEB |
2021 |
COMPLETED |
29 |
INVESTIGATION ON THE AIR BAG @ MURUM SUBSTATION |
THREE GORGES DEVELOPMENT COMPANY / SEB |
2021 |
COMPLETED |
30 |
SF6 GAS HANDLING SUPERVISOR @ BINTULU B SUBSTATION |
PESTECH SDN BHD / SEB |
2021 |
COMPLETED |
31 |
TONDONG STATCOM CABLE LADDER - DESIGN, SUPPLY AND INSTALLATION WORKS |
HITACHI ENERGY / SEB |
2021 |
COMPLETED |
32 |
FIBRE OPTIC CABLE TERMINATION WORKS C/W WIREMAN |
PESTECH SDN BHD / SEB |
2021 |
COMPLETED |
33 |
VACUUMING & FILTRATION WORKS FOR 1 UNIT OF 33KV FURNACE TRANSFORMER |
SAKURA FERROALLOYS SDN BHD |
2021 |
COMPLETED |
34 |
REPLACEMENT OF 132KV GIS DS MECHANISM BOX @ SIBIYU SUBSTATION |
PESTECH SDN BHD |
2021 |
COMPLETED |
35 |
275KV CURRENT TRANSFORMER OIL LEAK REPAIR @ OM SUBSTATION |
UPS PROTECTION SDN BHD / OM MATERIAL (SARAWAK) SDN BHD |
2021 |
COMPLETED |
36 |
TRANSFORMER INSTALLATION VACUUMING & OIL FILTRATION AND 132KV GIS CABLE BOX SF6 HANDLING AT OCIM PLANT SAMALAJU INDUSTRIAL PARK |
DOOWON MALAYSIA SDN BHD |
2021 |
COMPLETED |
37 |
ABB GENERATOR TRANSFORMER SERVICING AT BAKUN HEP |
GCB TECHNIK SDN BHD |
2022 |
COMPLETED |
38 |
275&132KV CVT DEFECT RECTIFICATION WORKS |
GE T&D INDIA LTD (RMK)/ SEB |
2022 |
COMPLETED |
39 |
MP6-ELECTRICAL WORK 33 & 6.6KV POWER CABLE TERMINATION @ OCIM PLANT |
DOOWON MALAYSIA SDN BHD / OCIM |
2022 |
COMPLETED |
40 |
TONDONG SUBSTATION REMOTE END RETROFITTING WORKS @ TONDONG 275KV SUBSTATION |
BAKUN SEJATI SDN BHD/ SEB |
2022 |
COMPLETED |
41 |
REPAIR WORK ON THE HV BUSHING FOR 33KV EPS SUBSTATION AT MURUM HEP |
SARAWAK ENERGY BERHAD |
2022 |
COMPLETED |
42 |
SCHEDULE MAINTENANCE SERVICE (TRANSFORMER LEAK RECTIFICATION AND SHUTDOWN MSS 1&2) |
UPS PROTECTION SDN BHD / OM |
2022 |
COMPLETED |
43 |
INSTALLATION, VACUUMING & FILTRATION WORKS FOR 1 UNIT OF 33KV FURNACE TX |
SAKURA FERROALLOYS SDN BHD |
2022 |
COMPLETED |
44 |
GENERAL MAINTENANCE 275KV AIS FOR 2 INCOMER LINE FEEDER HV EQUIPEMENT |
UPS PROTECTION SDN BHD |
2022 |
COMPLETED |
45 |
CONTROL CABLING AND TERMINATION LIMBANG 275KV GIS SUBSTATION |
VI SEMPURNA SDN BHD |
2022 |
COMPLETED |
46 |
CONTROL CABLING AND TERMINATION AT TONDONG STATCOM PROJECT |
HITACHI ENERGY |
2022 |
COMPLETED |
47 |
REPLACEMENT OF 132KV CURRENT TRANSFORMER AND 36KV NEUTRAL CURRENT TRANSFORMER FOR KEMANTAN 275KV SUBSTATION |
SARAWAK ENERGY BERHAD |
2022 |
COMPLETED |
48 |
PEMASANGAN ELEKTRIK UNTUK PROJEK PEMBINAAN RKAT TAMBAHAN PELBAGAI KELAS KEM BATU 10 SIBU, SARAWAK ( TENDER SEMULA) |
JABATAN KERJA RAYA MALAYSIA |
2023 |
COMPLETED |
49 |
MURUM HEP REACTOR RECTIFICATION WORK |
UPS PROTECTION SDN BHD |
2023 |
COMPLETED |
50 |
REPLACEMENT OF 33KV GIS SWITCHGEAR AT MATANG SUBSTATION |
LARSEN & TOUBRO LIMITED |
2023 |
COMPLETED |
51 |
COMPLETE ERECTION WORK FOR BAKONG 33/11KV SUBSTATION |
AMP TRANS ENGINEERING SDN BHD |
2023 |
COMPLETED |
52 |
TATAU GE 275/132KV TRANSFORMER RADIATOR REPLACEMENT |
GE WUHAN |
2023 |
COMPLETED |
53 |
MURUM HEP MAIN 275/132KV TRANSFORMER OFFLINE TESTING & SERVICING WORK INCLUDING DISSEMBLE AND ASSEMBLE OF SF6 GIS |
UPS PROTECTION SDN BHD |
2023 |
COMPLETED |
54 |
SG. MAAW 132KV INTERFACING SWITCHYARD COMPLETE ERECTION WORKS |
ZAFAS SDN.BHD. |
2023 |
ON GOING |
55 |
MAMBONG & ENTINGGAN 240MVA 275/132KV TRANSFORMER VACUUMING, OIL FILTRATION AND SUBSTATION CABLING WORK |
TRANSYSTEM CONTINENTAL SDN BHD |
2023 |
COMPLETED |
56 |
BINTULU B 132KV SUBSTATION COMPLETE ERECTION WORKS |
LARSEN & TOUBRO LIMITED |
2023 |
ON GOING |
57 |
2 UNIT OF 120MVA 132/33KV POWER TRANSFORMER VACUUMING AND OIL PURIFICATION VALUE @ TRANSMITTING SUBSTATION |
BORMAL ENGINEERING SDN BHD |
2023 |
COMPLETED |
58 |
SAMAJAYA SUBSTATION 2 UNIT OF 120MVA 132/33KV POWER TRANSFORMER VACUUMING AND OIL PURIFICATION @ SAMAJAYA SUBSTATION |
BORMAL ENGINEERING SDN BHD |
2023 |
COMPLETED |
59 |
4 UNIT OF 275KV SHUNT REACTOR INSTALLATION |
KEC LIMITED |
2023 |
COMPLETED |