Transformer & Reactor
We are specilise in transformer & reactor supply, installation, maintenance and servicing such as oil filtration and overhaul.

Gas Insulated Switchgear (GIS)
We can install GIS from 33kV up to 275kV including SF6 gas handling by our compentent personal.

EHV Transmission Substation
Our team are specialize in high voltage substation installation including circuit breaker, current transformer, voltage transformer, gantry, string, cabling, earthing and all related work.

Profesional Team
We have professional team in both design and installation work including site supervision, project management, electrical competent person, skilled worker along with plant & machinery.
Transformer & Reactor
Supply
We are appointed as the local agent by TBEA ShenYang Transformer Co. Ltd. We can provide support to supply their transformer which is one of the world leading transformer brand. They are also listed as approved brand in Sarawak Energy approved vendor list.
Installation
Our team are equiped with all the necessary machineries and skill worker to perform installation work including assebly, vacuuming, oil filtration and oil testing. We had installed various size of transformer all the way up to 275kV.
Maintenance & Servicing
As we have adequate tools, machineries, and worker with experience, hence we also assist factories to perform preventative maintenance and servicing work to their transformer & reactor to ensure they are oprating in good condition and minimize its down time.
Gas Insulated Switchgear
Installation
We had sent our team to supplier factory to accept training for GIS installation and have been working under multiple supplier's specilist to install GIS at multiple site.
SF6 Gas Handling
SF6 gas is one of the most stable gas which is why it had been widely used as insulator inside switchgear. However it is also a harmful green house gas, 1 kg of SF6 gas has the same impact of 23,500kg of Co2. Hence it can cause globle warming 23,500 time higher than Co2. Also it is a stable gas, hence it will stay in atmosphere for long period of time. In order to protect our earth, we handle the used SF6 gas properly to prevent it been release into our atmosphere. Our team are also trained by SF6 gas specilist on how to handle the gas properly.
EHV AIS Substation
Installation
EHV AIS Substation installation is one of our core business. Our team have experience to install all EHV equipment.
- Circuit Breaker
- Current Transformer
- Voltage Transformer
- Surge Arrester
- Post Insulator
- Busbar
- Stringing
- Gantry
- Beam
- Capacitor Bank
- Statcom System
- Battery System
- Cable Ladder
- Power Cable
- Multicore Cable
- Earthing
- Transformer & Reactor
- GIS
- Control Relay Panel
- ETC
About Us
Who We Are
We leverage our knowledge and creativity to best meet the needs of each client. Our expertise and strong network of strategic partners are at the very heart of our success. In each of our business units and across all our target verticals where we operate, our management teams, our knowledge of the context, local and global procurement networks, and design experts enable us to define the optimal solutions and planning that ensure a flawless project delivery.
Our Goal
Optimizing our customers’ project value by delivering sound turnkey solutions. We leverage our knowledge and creativity to best meet the needs of each client. Our expertise and strong network of strategic partners are at the very heart of our success. In each of our business units and across all our target verticals where we operate, our management teams, our knowledge of the context, local and global procurement networks, and design experts enable us to define the optimal solutions and planning that ensure a flawless project delivery.
- We are committed to deliver the best services to exceed our customers’ expectation which shall directly contribute to the growth of our company.
- We acknowledge the importance of accurate and timely information by maximizing all the communication tools.
- We pledge to perform and execute our business with enthusiasm and highest integrity.
- We aspire to be the model and company of choice for the recognized services rendered to our clients.
Our Portfolio
- all
- GIS Substation
- Transformer & Reactor
- EHV AIS Substation
- Project Team
- Bintulu B Substation
- MJC 132/33kV Substation
Equipment
Project
Our Projects
The MJC 132/33 kV Substation is a critical infrastructure project that strengthens the reliability of the electricity supply in Batu Kawa and supports growing demand in the area.
YPN Electrical Engineering & Construction (Sarawak) Sdn Bhd delivered the project as the main contractor in a joint venture with XD Power Transmission (M) Sdn Bhd. XD Power supplied the equipment and materials, while YPN managed overall project execution, including engineering design, material take-off, shipment coordination, construction, testing, commissioning, and associated works.
The project covered two sites:
-
MJC 132/33 kV Substation. The new substation comprises five 132 kV gas-insulated switchgear (GIS) bays, including two incoming bays, two transformer bays, and one bus section bay. The transformers step down the voltage from 132 kV to 33 kV. The existing 33 kV GIS switchboard was extended by two bays to connect it to the new substation.
-
Matang Substation. The existing 132 kV air-insulated switchgear (AIS) was extended by two bays to accommodate the transmission line connections that supply the new MJC substation.
The project combined new substation construction with extensions to existing facilities and involved both GIS and AIS systems. It was completed on schedule and successfully commissioned in the fourth quarter of 2026. The project also received a “Kecemerlangan” award from CIDB Malaysia following its Safety and Health Assessment System in Construction (SHASSIC) audit.
Kemantan 132kV CT & 36kV NCT Replacement
YPN Electrical Engineering & Construction (Sarawak) Sdn Bhd was awarded this project in year 2022 to replacement CT and NCT at Kemantan Substation.
We supplied 19 nos of TBEA CT and 2 nos of RITs NCT including all necessary accessaries to completed the job. The replacement work was carried out on 15 Jan 2024 - 28 Jan 2024. All CTs was commissioned successfully as planned.
Tondong 275/132/33kV Substation
Tondong 275/132/33kV Substation is the largest substation in Kuching constructed by SMSB-PPKSB Consortium. We play a roll as erector to install all electrical equipment. There are 26 bays of 275kV switchyard, 11 bays of 132kV switchyard, 2 units of 240MVA transformer, 8 nos of reactor, complete cable trench, cable ladder, power cable, multicore cable, earthing and lighting system.
Few years after we completed the project, it was commissioned in 2022. In year 2023, Hitachi Energy Sdn Bhd was awarded for Tondong Statcom extension. We are also was involved in the installation of statcom project. Currently the project is completed and commissioned successfully.
Projects
Man-hours
Workers